drawing number rev. fpsc 5001u 3 millimeters 2 place dec. 1 place dec. when unspecified scale : inches 2 place dec. 3 place dec. fractions - + - + +- angles tolerances drawing number dwn. app'd. title - + - + +- standex electronics a standex company date cincinnati ohio rev. this drawing and the information and technical data contained hereon, are confidential and proprietary to standex electronics and shall not be used in whole or in part without standex written consent fpsc 5001u 4/2/2012 ccr n/a 3 x/x .xxx .xx .x .xx x 4/3/2012 dcj fps-t revisions 1 initial release 4/3/12 dcj 2 add installation instructions; add water level; add dimensions 10/25/12 dcj 3 add custom tee fittings; 3/4" plug was 1" plug; remove bushing; add marking views 1/7/13 dcj notes: 1. float material: polypropylene, white 2. housing and retainer ring material: polypropyle ne, black 3. o-ring material: silicone 4. operating temperatures up to 70c 5. storage temperature up to 105c 6. electrical characteristics: - power rating (max) 50va - switching voltage (max) 200 vdc, 150 vac - breakdown voltage (min) 250vdc - contact arrangement spst - swiching current (max) 1.5 a dc, 1 .5 a ac - carry current (max) 2.5 a dc , 2.5 a ac - contact resistance 100 m - insulation resistance (min) 1012 - switch agency listed ul e12275 2 7. wire connections: 18awg ul1007/1569 or ul2468 8. float specific gravity: 0.75 (reference only) 9. plastic material regulatory compliance: fda, ro hs, ul 10. conforms to ul508 11. must pass minimum of 30 lbs. wire pull test usi ng dead weight for one minute bom for package item qty. sensor 1 tee, horizontal 1 tee, vertical 1 bushing 1 spigot 1 npt bushing 1 plug 1 warning label 1 instructions 1 * items required for assembly - pvc cement - teflon tape 3/4" npt spigot 1" to 3/4" npt schedule 40 threaded bushing schedule 40 pvc bushing 1" to 3/4" fps-t sensor wire: 6 feet schedule 40 3/4" plug schedule 40 custom 1" to 3/4" tee horizontal in-line schedule 40 custom 1" to 3/4" tee vertical in-line installation instructions * remove sensor prior to installation * do not glue sensor to housing * plug drain and fill pan to confirm sensor function after installation * remove sensor to clean & inspect .09" .10 water level @ sensor activation pipe centerline 1.68" 2.50" 3.35" 1.06" 2.18" vertical installation horizontal installation vertical tee marking horizontal tee marking
mouser electronics authorized distributor click to view pricing, inventory, delivery & lifecycle information: standex electronics: ? fps-t
|